-  SEALING OF VARIOUS SANITARY SEWER MANHOLES
 -  PLUMBING AND NEW SLAB FOR WASH AREA AT MAINTENANCE
 -  CONSTRUCT MI WORK/STORAGE AREA
 -  MARKET SURVEY, JOB ORDER CONTRACTS, SEARCH FOR SMALL
 -  MEDICAL GAS SYSTEMS UPGRADE
 -  REROOF BUILDINGS 145 SOUTH
 -  INSTALL FIRE ALARM TRANSMITTERS AND FIRE ALARM CONTROL
 -  ROOFING REQUIREMENTS
 -  REPLACE ROOF, BUILDING 1780
 -  ROADS AND DRAINAGE REQUIREMENTS IDQ, FORT POLK,
 -  ELECTRICAL UPGRADE AND LIGHTING REPLACEMENT, 3
 -  RENOVATE AIRCRAFT MAINTENANCE FACILITY, PHASE II,
 -  EXPAND FITNESS CENTER, BLDG 103, NAS, CORPUS CHRISTI,
 -  PARKING LOT EXPANSION, PRESQUE ISLE BR., ERIE PA
 -  GROUSE CREEK ORCHARD FENCE
 -  REPLACE ROOFING
 -  REPLACE HEAT PUMPS, VARIOUS HOUSING AREAS, MARINE
 -  STEAM DISTRIBUTION REPAIRS
 -  DEMOLISH BUILDING 75
 -  FREEPORT HARBOR, TEXAS, DREDGING ENTRANCE AND JETTY
 -  INSTALL AIRFIELD FENCING, DUKE FIELD (FIELD #3), EGLIN
 -  CORRECT OUTPATIENT DEFICIENCIES (NEW CANTEEN/CREDIT
 -  PAINT EXTERIOR WHERRY HOUSING
 -  REPLACE UNDERGROUND FUEL TANKS AT BUILDING 428 AND
 -  LIFE SAFETY COMPLIANCE OF BLDG 2792, FORT SAM HOUSTON,
 -  CHAIR RAILS AND DOORS AT YUMA AREA OFFICE
 -  AMBULATORY SURGERY CENTER
 -  RPL SWITHCHGEAR SUBSTATION 2
 -  REROOF HOUSING AREAS 22 & 23 AND 5202 MARNE COURT,
 -  IRON CREEK BRIDGE
 -  REROOF MODULAR BUILDING AT SANTA TERESA STATION, SANTA
 -  REROOF VARIOUS BUILDINGS, PHASE 1
 -  EXPAND COOLING TOWER/RETROFIT
 -  SMOKE BARRIER WALL RESTORATION-B57
 -  CORRECT SAFETY DEFICIENCIES
 -  AMBULATORY CARE PHASE 1
 -  PRIEST LAKE INFORMATION CENTER (PLIC)
 -  SP:CR23-95, MARGINAL WHARF OILY WASTE SYSTEM, TRIDENT
 -  RESTORATION OF FIRE DAMAGED HOUSE, 4613B IRONWOOD,
 -  REPLACE ROOF, JOHN N. REESE JR. USARC, TULSA, OK
 -  INSTALL 10-TON HEAT PUMP, BUILDING 33 AT NAWS, POINT
 -  STREAMBANK EROSION PROTECTION, HIGHWAY 17, DES MOINES
 -  INSTALL TWO SEWAGE GRINDERS, 14 AREA AND 22 AREA, AT
 -  SPRINKLER SYSTEM REVISIONS-B57
 -  RENOVATE TRANSIENT LODGING FACILITY, BUILDING P-80,
 -  INSTALLATION OF PERIMETER FENCE
 -  JORSTED ROAD, HOOD CANAL RANGER DISTRICT, MASON
 -  REPLACEMENT OF ROOF AND PARAPET WALLS- MOTT HAVEN VI
 -  UPGRADE HVAC BUILDING 6
 -  RENOVATIONS TO MAIN LOBBY AND VISITORS AREA, BUILDING
 -  REPLACE WINDOW PANELS AT BUILDING 198 AT THE NSWC,
 -  CONSTRUCT OBSERVATION TOWER AT RANGER 28
 -  GROUND WATER REMEDIATION
 -  WATERPROOF BUILDING 8
 -  INSTALLATION OF EMERGENCY GENERATOR
 -  REMOVE THREE ABOVE GROUND STORAGE TANKS.
 -  PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND PERFORM
 -  FAMILY HOUSING REVITALIZATION FOR CASCAJO POINT
 -  RENOVATE SHRUBEDS MIRAMAR HOUSING MIRAMAR CORPS AIR
 -  REPLACE HVAC UNIT, VKF HOTSHOT BUILDING
 -  MAINTAIN/REPAIR BUILT-UP ROOFS INDEFINITE DELIVERY
 -  RENOVATIONS TO BUILDING 10, PHASE II, LETTERKENNY ARMY
 -  MISCELLANEOUS FIRE SAFETY DEFICIENCIES-B57
 -  REMOVE LEAD PAINT
 -  7E MULTI-PURPOSE ROOM
 -  MODIFY KITCHEN RANGE CABINETS
 -  WIEBE TRAIL RESTORATION
 -  MAINTAIN BASE ROADS, PHASE II & III
 -  REPAIR SEWER SYSTEM NAVAL SUBMARINE BASE SAN DIEGO
 -  ASBESTOS REMOVAL -B2
 -  SYNOPSIS NOTICE, REPLACE(DECENTRALIZE) CENTRAL PLANT
 -  REPAIRS TO BUILDINGS 9001 AND 9002 AND BREEZEWAY, FORT
 -  LIFE SAFETY CODE COMPLIANCE OF BLDG 2792, FORT SAM
 -  DESIGN/BUILD HVAC SYSTEM, BUILDING 8
  
 