| 
 
|  |  |  | 
 | Z - Maintenance, Repair or Alteration of Real Property SOLICITATIONS 
 
 STORM BARRIER RECONSTRUCTION -- ROCK REVETMENT,
 INSTALLATION OF POWER FACTOR CAPACITORS, GENERAL MAIL
 REPAIR HVAC SYSTEM, BUILDING 242, NAVAL STATION
 RENOVATION OF WEATHER FORECAST OFFICE AT OXNARD, CA
 REPLACE OIL/WATER SEPARATOR
 REPLACE BOILER AT USCG STATION LITTLE CREEK, NORFOLK,
 INSTALL IRON REMOVAL SYSTEM AT USCG STATION ANNAPOLIS
 REPAIRS TO HOUSING UNITS
 UPGRADE DDC CONTROLS IN MCALLISTER HALL
 UPGRADE/REPAIR TROOP QUARTERS, VOLK FIELD CRTC, CAMP
 DEMOLITION OF BLDGS 53, 54, 58, 513 AND 1138 AT THE
 REPAIRS TO HOUSING UNITS
 REHAB/REPLACE FLOATING DOCKS @ ISC BOSTON
 STORM BARRIER RECONSTRUCTION -- ROCK REVETMENT,
 RE-PAINT SKYLAND STEEL WATER RESERVOIR
 PAINT WATER TOWER
 RFQ -- MAINTENANCE AND REPAIR TO FIRE ALARM SYSTEM,
 WELDING REPAIR OF BULKHEADS
 PIER FENDER/DEEP DRAFT SEPARATOR REPAIR, NAVAL
 PINE KNOT CCC GYMNASIUM RENOVATION
 EXTERIOR REPAIRS AT MELVILLE HOUSING, NAVAL COMPLEX,
 PTF INTERIM ELECTRICAL SERVICES, NAVAL UNDERSEA
 UPGRADE 90 DAYS STROAGE FACILITIES
 INSTALLATION OF BATH TUB ENCLOSURES, MITCHEL FIELD
 REFINISH HARDWOOD FLOORING, MITCHEL FIELD FAMILY
 INTERIOR PAINTING, MITCHELL FIELD FAMILY HOUSING
 ITEM II PUMP STATION, CITY OF ST. PETERS, FLOOD
 NORTH CLOSURE STRUCTURE STE. GENEVIEVE FLOOD CONTROL,
 ECIP HOSPITAL AND DENTAL CLINIC ENERGY UPGRADE FT.
 PAVING; CONSTRUCTION AND REPAIR
 REMODEL EXISTING BUILDINGS 2101 AND 2102, FT MCCOY,
 REPAIR AND PAINT EXTERIOR OF BUILDING 414 (GYMNASIUM)
 REPLACE CONDENSATE LINE
 REPAINT ROAD STRIPES AND INSTALL REFLECTORS AT VARIOUS
 RESTORATION OF WETLAND RESERVE PROGRAM SITE
 REPAIRS TO HANGAR 5, NAS ATLANTA, MARIETTA, GA
 ADDITIONS TO OPERATIONS BUILDING, NAS ATLANTA,
 CONTAINMENT CURB FOR OFF-LOAD STATION, NAS ATLANTA,
 REPLACE ROOFS IN QUARTERS G,L,M,R & S
 REPAIRS TO HOUSING UNITS
 PROVIDE SALTWATER PUMP B490, NAVAL SUBMARINE BASE NEW
 LIQUID NITROGEN LINE
 PAINT EXTERIOR, VARIOUS BUILDINGS, NSGA, WINTER
 FACILITIES SUPPORT CONSTRUCTION, INDEFINITE QUANTITY
 CONSTRUCT SECONDARY CONTAINMENT SYSTEM AT MCGUIRE AFB
 INSTALLATION OF PLAYGROUND INFRASTRUCTURE AND
 CLEAN AND PAINT WATER TOWERS, PROJECT NO. 94-0053 AT
 ESR #9753.017, REPAIR TWELVE (12) INCH WATERLINE, 22
 Today's CBD Index Page
 Created on March 27, 1997 by Loren Data Corp. -- 
info@ld.com
 | 
 |  |