| 
 
|  |  |  | 
 | Y - Construction of Structures and Facilities SOLICITATIONS 
 
 DEMOLISH AND REPLACE WATER STORAGE TANKS
 MALAYSIA: S15 CONSTRUCTION OF SCHOOLS, OTHER
 TRAINING FACILITY, FY96 BRAC PROJECT P-023T, FLEET
 AIR BASE GROUND DEFENSE BED-DOWN, LACKLAND AFB AT CAMP
 TRAINING RANGES, CAMP BULLIS, LACKLAND AIR FORCE BASE,
 REPAIR FIRE ALARMS, VARIOUS BUILDINGS!
 SHUTTER TRANSPORT SYSTEM DESIGN, REPAIR AND
 CONSTRUCT INERT MUNITIONS BUILDING
 MAINTAIN LANDSCAPE MFH.
 REPAIR LIFT STATION, BLDG 1000
 REPLACE WINDOWS, PROVIDE A/C 2ND FLOOR, AND PROVIDE
 CONSORTIUMS INTERESTED IN CONSTRUCTION DUE 072595.
 TRANSFORMER REPLACEMENT, TRACY FISH COLLECTING
 RELOCATE CHILLER AND INSTALL E/G RADIATOR ATCT.
 CONSTRUCT CONCRETE PADS FOR RADAR SITE ON SAN NICHOLAS
 LOWER GRANITE SURFACE COLLECTOR, LOWER GRANITE DAM,
 CONSOLIDATED BRIGADE VEHICLE MAINTENANCE FACILITY,
 UPGRADE TO AND CONSTRUCTION OF ADDITION TO BUILDING
 CONSTRUCT STORAGE BUILDINGS FOR 160TH SOAR
 FURNISH ALL LABOR, EQUIPMENT AND MATERIALS TO CONSTRUCT
 CONSTRUCT PAXMAN ENGINE REBUILD FACILITY, YERMO ANNEX,
 CONSTRUCT BASE FIRE STATION, BATTLE CREEK ANG BASE,
 WHITE SPAR VAULT TOILETS
 CONVERT VAULT TOILETS WITH SHOWERS, HORSESHOE BEND
 RUNWAY 18-36 EAST PROGRAM, TAXIWAY ``J'' EXTENSION
 CONSTRUCTION OF A NEW COMFORT STATION WITH A FIRST
 LANDSCAPE RENOVATION STATION-WIDE INCLUDING BACHELOR
 LOW WATER STRUCTURE, SUGAR TREE MOUNTAIN ROAD
 CONSTRUCT GENERATOR BUILDING
 CAN SHOP INTERIOR REPAIRS, BLDG 8, CCAD, NAS, CORPUS
 SPIDER LAKE TRAIL
 CLOVERLICK ROAD
 CONSTRUCT CEDAR GROVE RESIDENCES, KINGS CANYON
 RUNWAY 18-36 EAST PROGRAM, LIGHTING REGULATOR VAULT NO.
 REPLACE HVAC SYSTEM EQUIPMENT, BLDG 90, NAS, CORPUS
 GRANITE BASIN LAKE RECREATION
 CROOKED WASH ROAD FY95
 REQUIREMENTS CONTRACT FOR INDIVIDUAL WATER WELLS AND
 GLOBE DISTRICT OFFICE EXPANSION
 MICROSEAL STREETS AND PARKING AREA AT BLDG 172, NAS,
 REPAIR RUNWAY 1-19 AT NALF, ORANGE GROVE, TX
 UPGRADE FIRE ALARM SYSTEMS FOR VARIOUS BLDGS, NAS,
 FURNISHED AND INSTALL SECURITY ALARM SYSTEM FOR THE
 AIR CENTER IMPROVEMENT - PHASE I
 STANDBY EMERGENCY GENERATOR
 REMOVAL & REPLACEMENT OF THREE TRAIL BRIDGES-BLUE
 TENNANT OFFICE RELOCATION
 RELOCATE HOUSE
 TOILET ADDITION
 WYENKOOPI ROADS
 PRE SYNOPSIS - REPAIR AND RESTORATION OF WEST WING
 RECONSTRUCTION OF POUDRE RIVER LANDINGS
 FOX FIELD EMERGENCY COMMUNICATIONS CENTER HVAC
 INSTALL FIRE DETECTION AND ALARM SYSTEM, HORSEHEADS
 CONSTRUCT BASE FIRE STATION, BATTLE CREEK ANG BASE,
 POWER SYSTEM MODIFICATION
 Today's CBD Index Page
 Created on September 29, 1996 by Loren Data Corp. -- 
info@ld.com
 | 
 |  |