'
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT
PY 94\95 SHOWER REHABILITATION, BUILDING OVER SEWAGE
PY 95\96 REPLACE CENTRAL HEATING SYSTEM AT THE RED
INSTALL A 7FT HIGH FENCE AT THE WEST END OF PUGET
INSTALL NEW CARPET ON THREE FLOORS OF BUILDING 443 AT
PREP & PAINT FIRST, SECOND AND BASEMENT FLOORS OF
INSTALL, REPAIR AND MAINTAIN OVERHEAD DOORS IN
UNDERGROUND STORAGE TANKS (USTS)
NORTH WING RENOVATION, PILOT PLANT AT THE NATIONAL
NORTH WING RENOVATION, PILOT PLANT AT THE NATIONAL
ROOF REPAIR AT CRAIG BROOK NATIONAL FISH HATCHERY IN
HEATING SYSTEM RENOVATION AT BUILDING C-2
ROOF AND HVAC FOR ARNOLD LAKESIDE CLUB
RESURFACE ROADWAY(S)
GROUND FLOOR - DEX-O-TEX FLOORING
REPLACE AHU AND DUCTWORK B-117
REPAIR UNDERGROUND STORAGE TANKS AT TANK FARM B
SIMPLIFIED ACQUISITION OF BASE ENGINEERING
REPLACE MASONRY ELECTRICAL VAULT #83 - NAVAL SUBMARINE
DEMOLITION OF CONCRETE TARGETS REQUIREMENTS CONTRACT,
REPAIR DUCT INSULATION,BLDG 2825
REPAIR EROSION DAMAGE, FAMCAMP
Today's CBD Index Page
Created on October 10, 1996 by
Loren Data Corp. --
info@ld.com