|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- GYMNASIUM FLOOR REFINISHING, VARIOUS BLDGS, FT. LEWIS
- VARIOUS REPAIRS TO SEWAGE TREATMENT PLANTS (TP-420MS /
- DALLAS, TX 75240-9998 - SPRING VALLEY STATION, ROOF
- PRE-SOLICITATION NOTICE - JOB ORDER CONTRACT,
- EXTEND BERMS, MCRD, PARRIS ISLAND, SC
- DESIGN/BUILD STORAGE FACILITY, NAVAL AND MARINE CORPS
- IMPROVE SENIOR OFFICER QUARTERS
- CONSTRUCTION SERVICES, FOR THE MESCALERO IHS INDIAN
- DESIGN/BUID NEW LIGHTING SYSTEM, BUILDING 11, NAVAL
- INDEFINITE QUANTITY CONTRACT FOR EXTERIOR AND INTERIOR
- PRE-SOLICITATION NOTICE TO ALERT CONTRACTORS OF A
- PRE-SOLICITATION - REPAIR AND REPLACE UNDERGROUND FUEL
- BUILDING 851 PLASTICS HANDLING BAGHOUSE SYSTEMS AT THE
- MAINTAIN/REPAIR/UPGRADE NDI FACILITY, HTUX 96-0005
- REPAIR ROOFS, BUILDINGS 4207 AND 4752
- RENOVATION OF THREE LIMESTONE CONTACT TANKS
- INDEFINITE QUANTITY CONTRACT FOR GENERAL CONSTRUCTION
- INDEFINITE QUANTITY CONTRACT FOR GENERAL CONSTRUCTION
- INDEFINITE QUANTITY CONTRACT FOR GENERAL CONSTRUCTION
- EVALUATE AND RECONFIGURE
- DOCK FLOOR TILE (VINYL COMPOSITION TILE
- CONVERT 2.4 KV ELECTRICAL DISTRIBUTION SYSTEM TO 13.2
- REMOVE AND REPLACE ROOF WATER STORAGE RESERVOIR
- REPLACE FIRE ALARM SYSTEMS, MULTI-FACILITY
- REPAIR CURBING
- MAIN AND DITCH NO. 2, ITEM 1, COUNTY BRIDGE AT MILE
- REPLACE COOLING TOWER AT THE NATIONAL WILDLIFE HEALTH
- PARITION CONTRACT
- BUBBLER SYSTEM, STARVED ROCK LOCK, ILLINOIS WATERWAY,
- PROVIDE HYDROGEOLOGICAL SERVICES
- REPAIR ROOFS, VARIOUS FACILITIES DUE 031095
- CONCRETE RESTORATION, PHASE I, BUILDING 220, PR
- FRONT LOBBY ENTRANCE REPLACEMENT, U.S. POST OFFICE,
- TREE TRIMMING SERVICES
- PAVING & ROAD CONSTRUCTION
- REPLACE HVAC SYSTEM
- UST REMOVAL AND SVE INSTALATION, CAMERON STATION, VA
- EMERGENCY STREAMBANK PROTECTION, COUNTY HIGHWAY 23/8,
- PRE-SOLICITATION NOTICE, DRAINAGE IMPROVEMENTS, FAMILY
- FAA REMOVE/REPLACE UNDERGROUND STORAGE TANK AT
- REHAB CANEY LAKE RECREATION AREA CAMPING LOOPS
- RENOVATE VISITING AIRMAN QUARTERS, BLDG 441
- GROUNDING SYSTEM REHAB AT LORAN STATION GEORGE,
- PAINT QUARTERS 5 WEST
- REPLACE ROOF, BLDG. 1, MORRIS, MN.
- ASBESTOS ABATEMENT IDIQ
- FENCE CONSTRUCTION
- ALTERATIONS TO THE ENVIRONMENTAL TEST LAB, BUILDING
- REPAIR DAM SCOUR - DAM 2, ALLEGHENY RIVER
- OLD AGENCY NORTH ROAD PROJECT
- KYLE TO SD 44 OVERLAY ROAD PROJECT
- PORCUPINE EAST AND ALLEN TO KYLE OVERLAY PROJECT
- SIMPLIFIED ACQUISITION OF BASE ENGINEERING
- INSTALLATION OF WATER MAIN
Today's CBD Index Page
Created on September 29, 1996 by Loren Data Corp. --
info@ld.com
|
|
|