|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- LD1 SLURRY WALL 1998 FLOOD PHASE III REPAIRS, PL 84-99
- LAKE CREEK LEVEE ACCESS ROAD AND BRIDGE,TETON COUNTY,
- INDEFINITE DELIVERY INDEFINITE QUANTITY ROOFING
- INSULATE SL2/3 HEATER DUCTING AND VALVES
- SECTIONAL DOOR REPLACEMENT
- INSULATE SL2/3 HEATER DUCTING AND VALVES
- REPLACE SANITARY SEWER SYSTEM AT AREA "A", FORT
- BIG LARCH AND RIVER POINT CAMPGROUNDS
- REPAIR POL PITS
- RECONFIGURE FOOD COURT
- REPAIRS TO RECYCLING EQUIPMENT
- SAN LUIS OBISPO CA MISSION STATION HVAC REPLACEMENT,
- RENOVATE WORLD CLASS PHYSICAL FITNESS CENTER (YMCA),
- FY 00 MAINTENANCE DREDGING, BAY CENTER ENTRANCE
- RESTROOM ADDITIONS TO BUILDING 2
- BEACH NOURISHMENT, ST.JOHNS COUNTY SHORE PROTECTION
- HALLS AND WALLS
- CONSTRUCT/INSTALL CONFERENCE TABLE, BLDG #27, MCCARTY
- APPLICATION OF ROADWAY BITUMINOUS SURFACE TREATMENT
- UPDATE WIRING IN DAM
- EVAPORATIVE COOLING FOR HANGAR BUILDING 4833
- REPLACE MAIN STEAM LINE
- REPAIR THE PRIMARY SETTELING TANK TO FORRESTAL SEWAGE
- REPAIR A/C SYSTEM BQ 3175, 3176, 3178, 3180, 3181
- HOSPITAL BUILDING REROOF-EAGLE BUTTE, SD, PROJECT NO.
- REPLACE FLOATING DOCK, USCG STA BRANT POINT,
- INSULATE SL2/3 HEATER DUCTING AND VALVES
- RENOVATION OF FIVE INDIAN HEALTH SERVICE QUARTERS AT
- REMOVE EXISTING ROOFING AND REPLACE WITH BUILT UP
- SEAL AND RESTRIPE PARKING LOT AND PERIMETER ROAD
- BEACHFILL, GREAT EGG HARBOR INLET AND PECK BEACH,
- MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR
- SPRINKLER HEAD REPLACEMENT
- FY00 MAINTENANCE DREDGING FOR ST. CLAIR RIVER,
- JETTY WALKWAY REHABILITATION, COLORADO RIVER AND
- RENOVATE HUNTINGTON HOUSE
- Z -- UPGRADE BOAT HAULOUT FACILITIES
- REPLACE TYPE III SYSTEM ISOLATION VALVES
- CONSTRUCT / INSTALL CONFERENCE TABLE, BLDG 27, MCCARTY
- REMODEL OF AN EXISTING COMPUTER ROOM LOCATED IN
- FACILITY IMPROVEMENTS CHEYENNE RIVER SERVICE UNIT
- DREDGE BOAT BASIN AT U. S. COAST GUARD STATION VENICE,
- BUILDING 4840 SEISMIC REPAIRS
- VEHICLE STORAGE ENCLOSURE
- WIGWAM CREEK & BIG THERRIAULT CREEK BRIDGE REPAIRS
- SOURCES SOUGHT FOR MODERNIZATION OF THE VERTICLE
- INSTALL DRIP IRRIGATION SYSTEM
- REMODEL TWO RESTROOMS
- RELOCATE UTILITIES UNDERGROUND -- MANATEE BAY
- MAINTENANCE, REPAIR ON ALTERATION OF REAL PROPERTY
- PROVIDE AND INSTALL 142 PRE-FINISHED GALVANIZED STEEL
- LOBBY RENOVATION PROJECT, MAIN POST OFFICE,
- BUILD A TRUCK LANE AT THE U.S. BORDER STATION,
- INSTALL LIGHTING, B RAMP
- CONSTRUCTION MANAGER AS CONSTRUCTOR SERVICES FOR
- NMFS, LA JOLLA, CA., REQUIRES CONTRACTOR TO REMOVE
- APPLYING ROADWAY BITUMINOUS SURFACE TREATMENT
This Issue's Index
Today's CBD Index Page
Created on May 24, 2000 by Loren Data Corp. --
info@ld.com
|
|
|