|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- PAINTING AND REPAIR OF FACILITIES AT NIH.
- STABILIZE BUILDINGS AT DINOSAUR NP, CO
- FIXED PRICE CONTRACT FOR NEW CONSTRUCTION OWNED --
- ENCINOSO PICNIC AREA REHABILITATION
- REPAIR & REFINISH TERRAZZO FLOOR, USS ARIZONA
- REPAIR SANITARY SEWER MAINS, LUKE AFB
- UPGRADE HANGAR 3160 DRAINAGE AT USCG AIR STATION CAPE
- ROOF REPAIR
- REPLACE COOLING WATER HEAT EXCHANGERS
- REPLACE FAN COIL UNITS
- REPAIR HVAC/EXHAUST HANGAR 7
- CLEAN AND LINE POTABLE WATER LINES
- ALTER DUNN DENTAL LAB & STORAGE AND CONSTRUCT
- REPAIR CONTROL TOWER
- REPLACE LIFT STATION, SAN ONOFRE AREA, AT THE MARINE
- BOUNDARY PERIMETER PILING AND FLOATING BOOM AT THE
- RENOVATE HEADS, BUILDING 603, NAVAL SUPPORT ACTIVITY,
- SLOPE PROTECTION AND STABILIZATION AT THE ACOUSIC
- CONSTRUCT STORAGE SHEDS FOR GILMORE PARK HOUSING,
- Z RE ROOF BUILDING 80
- CULVERT REPLACEMENTS (198) -- POWERS RANGER DISTRICT
- REPLACE POTABLE WATER PUMP BLDG. 601, 602, EAST BANK,
- STAIRWELL RENOVATIONS, BUILDING 602, NAVAL SUPPORT
- ROAD NO. 23 STABILITY REPAIR (156) -- EASTSIDE
- REPLACE COUNTERPOISE FRAMING SUPPORT COLUMN AND
- HAMBY FORK ROAD REPAIR
- ASPHALT (PREPARE AND REPAVE ROADWAY)
- REPAIR BASE ROADS AND CURBS
- REHABILITATE RIM VILLAGE SEWER, CRATER LAKE NATIONAL
- EQUIPMENT RENTAL TO REPAIR DIKE, MARK TWAIN NWR,
- DRYWELL SEWAGE PUMPS, RELATED CONTROLS AND DISCHARGE
- SITE DEVELOPMENT-DRAINAGE SYSTEM
- INDEFINITE DELIVERY QUANTITY (IDIQ) CONSTRUCTION
- REMOVAL OF FALLEN TREES AND EROSION CONTROL OF ROAD
- SITE IMPROVEMENTS, ELECTRICAL AT AREA A AND SITE 28
- HOUSING LANDSCAPE IMPROVEMENTS PINEHURST ESTATES PHASE
- ADD/ALTER CHILD DEVELOPMENT CENTER, LAUGHLIN AFB, DEL
- AUTO TOUR ROAD REHAB
- PAVEMENT REPAIRS, APARTMENT AREA, MARINE CORPS COMBAT
- POLYURETHANE SPONGE CLEANING(PIGGING)OF CAST IRON
- POST WIDE PAVING REQUIREMENTS CONTRACT
- REMOVE EXISTING SEWAGE EJECTION STATION MANHOLE
- FIRST BEACH RENOURISHMENT,SAND KEY BEACH EROSION
- ROOF REPAIR/REPLACEMENT
- REPLACEMENT OF BURIED WATER PIPE AND VALVES IN THE
- CONSTRUCT NEW PRE-ENGINEERED STRUCTURE
- REHABILITATION OF POND B1, WHITE SULPHUR SPRINGS
- INSTALLATION OF L.P. GAS-FIRED FORCED AIR HEATING
- ALTERATIONS FOR COURTHOUSE
- EXECUTIVE MBA PROGRAM
- INSTALL FINE REMOVAL AT THE SEWAGE TREATMENT PLANT
- RENOVATE ROOMS BLDG. 7 AT VAMC SALISBURY, NC
- RELOCATE GENERATOR BLDG. 11 AT VAMC SALISBURY, NC
- SCARIFY AND PULVERIZE APPROX. 40,000 SQ.YD. (APPROX. 8
- MAINTENANCE,REPAIR, AND ALTERATION OF REAL PROPERTY
- ROOFING OF BLDG. 200, 206, AND 248
- PRE SOLICITATION NOTICE -- REVITALIZATION OF 60
- ALTER MILITARY SERVICE STATION (MSS) BUILDING 322
- ALTER AND REPAIR AGE SHOP
- INSTALL GAS CHILLER AND REPAIR CHILLED WATER LINES,
- RENOVATE DINING ROOM, B-4
Today's CBD Index Page
Created on June 17, 1997 by Loren Data Corp. --
info@ld.com
|
|
|