Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- DEMOLITION OF OWWO TREATMENT PLANT, CRANEY ISLAND,
- REPLACE FLOOR DRAINS AT WATER PLANTS, BUILDINGS 20,
- AIRFIELD STRIPING/PAINT/RUBBER REMO
- MODIFICATIONS TO THE 1/2 METER QUIET TUNNEL AIR
- CORRECT POTABLE WATER LINE DEFICIENCIES (TP-9879MS)
- ENVIRONMENTAL COMPLIANCE AND RESTORATION PROJECT
- REPAVE SHOULDER PRIMARY RUNWAY
- REPAIR FILL STAND & DRAINAGE
- BUILDING WATERPROOFING AT STATION NEAH BAY, NEAH BAY,
- REPLACE SHORE TIE OUTLETS ON FUEL PIER
- REMOVE AND REPLACE TANKS VARIOUS LOCATIONS, NAVAL AIR
- CENTER CORE REHABILITATION, R58-97, R1-98, R3-98 AT
- STEEL FABRICATION SERVICES
- REPAIR SANITARY SEWER SECURITY HILL AREA
- INSTALL SEWER CONNECTION AT BUILDING T 111, NEW HAVEN
- UPGRADE TROLLEY/HOIST SYSTEM, B-101
- REMOVE RUBBER DEPOSITS/PAINT AND RESTRIPE AIRFIELD
- REPAIR WATER CONTROL STRUCTURES
- TRAIL EXCAVATION
- REPLACE CHILLERS, PIERRE, SOUTH DAKOTA
- CORRECTION OF ELEVATOR DEFICIENCIES.
- REPLACE 8" FIREPROTECTION AND 4" CONDENSATE LINES FROM
- EMERGENCY STREAMBANK RESTORATION -- PICKENS 4
- REMODEL, FARGO SERVICE CENTER, NORTH DAKOTA
- REPAIR ELECTRIC, BASE TRAILER COURT
- ASBESTOS ABATEMENT (LIMITED TO EXTERIOR PAINT REMOVAL)
- ASBESTOS ABATEMENT (LIMITED TO EXTERIOR PAINT REMOVAL)
- CROCKETT COLLIERIES RAMP PROJECT, PHASE II, BELL CO.,
- HARLAN FUELS RAMP PROJECT, PHASE II, HARLAN CO., KY
- REPAIR HVAC, ROOM L-30, AFWA
- INSTALL A NEW WALL THIMBLE AT DRY DOCK #3, PUGET SOUND
- PAVEMENT AND DRAINAGE REPAIRS, MARINE CORPS RESERVE
- BOILER INSTALLATIONS, NAVAL AIR STATION, SOUTH
- AMERICAN RIVER WATERSHED PROJECT (COMMON FEATURES),
- REHABILITATION OF INSCRIPTION ROCK LOOP TRAIL, PHASE
- TELEPHONE/COMMUNICATION CLOSET INFRASTRUCTURE PROJECT
- INCREASE ELECTRICAL DISTRIBUTION
- RENOVATE EXISTING COMMISSARY FACILITY AT KIRTLAND AFB,
- EMERGENCY REPAIRS OF ELECTRICAL SYSTEM AT LEONARD C.
- STONE DIKE CONSTRUCTION IN THE MISSISSIPPI RIVER AT
- REPAIR ROOFS, 12 UNITS, MFH
- REPAIR ROOF, COLLOCATED CLUB, BUILDING 700, MCCHORD
- MAINTENANCE, REPAIR AND ALTERATION OF REAL PROPERTY
- PROVIDE ALL LABOR, MATERIALS, EQUIP. & SUPERVISION FOR
- TWO PHASE DESIGN/BUILD BARRACKS UPGRADE PROJECT, FORT
- RPL ROOF & MECH SYSTEMS BLDG 3108
- REPAIR ROOFS
- INSTALL THIRTY-TWO (32) LOW ENERGY BARRIER FREE SWING
- UPGRADE/REPAIR INTERIOR
- ROOF REPAIR AND REPLACEMENT OF EPDM, BUILT-UP, METAL
Today's CBD Index Page