|
|
|
Y - Construction of Structures and Facilities
SOLICITATIONS
- DEEP CREEK, POLE CREEK AND SAGEHEN CREEK ROADS
- CONSTRUCT PLAYING FIELDS, NAVAL STATION, INGLESIDE, TX
- ARAVAIPA CONTACT STATION
- MISCELLANEOUS O&M WORK, FORT BRAGG, NC
- FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES,
- ENTERENCE EXTENSION
- INVITATION FOR BIDS FOR ROLLED COMPACTED CONCRETE
- STORMY TRAIL CONSTRUCTION OKANOGAN NATIONAL FOREST
- HRTMAN BAR TRAIL REPAIR PROJECT
- IBERLIN PIPELINE
- PASSES OF THE MISSISSIPPI RIVER, SOUTHWEST PASS,
- CONSTRUCTION OF PREDATOR CONTROL FENCE AT WILLARD
- PY'96 NEW PHYSICAL FITNESS CENTER AT THE DAVID L.
- NEW MAIN POST OFFICE, ROUND LAKE BEACH, ILLINOIS
- HOUSE DEMOLITION, PHASE IV, PERRY CREEK, SIOUX CITY,
- MISCELLANEOUS O&M WORK, FOR BRAGG, NC
- CONSTRUCTION OF PLUMBING AND VENTILATION SYSTEM FOR
- NEW MAIN POST OFFICE, GURNEE, ILLINOIS
- FURNISHING AND INSTALLING A STORAGE TANK ON THE
- SUPPLY AND CONSTRUCT 28' X 92' MODULAR OFFICE AT
- DUGWAY CAMPGROUND
- ASBESTOS REMEDIATION AT VALLEY FORGE NATIONAL
- TOTAL RENOVATION AND EXPANSION OF EXISTING BUILDING,
- GIBSON RESERVOIR BOAT LAUNCH
- SAFFORD AIR OPERATIONS CENTER
- ORGAN MOUNTAIN ROADS SURFACE TREATMENT
- EDUCATION CENTER/LIBRARY MACDILL AFB, FL (HILLSBOROUGH
- WELL PLUGGING
- CANYON TRADING POST
- WELL PLUGGING
- CHILD DEVELOPMENT CENTER MACDILL AFB, FL (HILLSBOROUGH
- 3-PANEL VERTICAL LIFT DOOR FOR 3RD POWERPLANT, GRAND
- CONSTRUCTION OF PREDATOR CONTROL FENCE AT WILLARD
- INSTALL FIRE SUPPRESSION SYSTEM, ANGEL PEAK NV
- WHOLE BARRACKS COMPLEX RENEWAL, FORT SILL, OKLAHOMA
- BLEACHER CANOPIES AND OUTDOOR STAGE IMPROVEMENTS,
- DEER CREEK STATE PARK FACILITY IMPROVEMENTS PHASE 2,
- RENOVATE BUILDING 2 -- NATIONAL INSTITUTES OF HEALTH,
- ELECTRICAL WIRING OF THE STAFF RESIDENCE AT HAKALAU
- INSTALLATION OF CORRUGATED PLASTIC PIPE STRUCTURES &
- PASSES TO THE MISSISSIPPI RIVER, SOUTHWEST PASS,
- RENOVATE BUILDING 108, FORT BENNING, GEORGIA
- UPGRADE REGIONAL HOME STATION TRAINING SITE
- WASTEWATER EQUALIZATION & SPILL PONDS, AREA A, HOLSTON
- WINDOW REPLACEMENT BUILDINGS 5 & 10 EDISON, NEW JERSEY
- CONSTRUCTION OF STRUCTURES AND FACILITIES
- REHABILITATION OF FEDERAL STEAMBANK STABILIZATION
- CONSTRUCTION OF USARC/OMS, SALT LAKE CITY, UTAH
- REPLACE WATER CUT-OFF VALVES, FAMILY HOUSING AREAS
- PORTAL ROAD PAVING, PHASE III
- DIVIDE AREA RESTORATION-DETROIT RANGER DISTRICT
- UPGRADE HEATING & VENTILATION SYSTEM, BLDG 600, FT
- RED RIVER WATERWAY, MISSISSIPPI RIVER TO SHREVEPORT,
- BUCKHORN ROAD DECOMMISSIONING PROJECT ON THE PAYETTE
- STORAGE/ADMIN FACILITY TYNDALL AFB, FL (BAY COUNTY)
- CONSTRUCT PRE-ENGINEERED CHAPLAINS BUILDING
- CONSTRUCTION OF THREE (3) BUS SHELTERS IN THE PLEW
- CONSTRUCT CONFORMING STORAGE FACILITY, MARINE CORPS
- BOILER PLANT IMPROVEMENTS PHASE II
- RENOVATE 3RD FLOOR OF BLDG 61 AT VAMC AT AMERICAN LAKE
- PRE-SOLICITATION ANNOUNCEMENT: FIREARMS RANGE
- PROVIDE 3 HYDROELECTRIC TURBINES (TURBINE RUNNERS),
Today's CBD Index Page
Created on July 24, 1998 by Loren Data Corp. --
info@ld.com
|
|
|