|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- RESTORATION/CONSERVATION OF GEORGE
- HVAC RENOVATION, USARC FINKBEINER, LITTLE ROCK, AR.
- REMOVAL ACTION EXCAVATION AND THERMAL TREATMENT OF
- CORRECT WATER PRESSURE DEFICIENCIES IN SARATOGA
- REPAIR VOQ B-1036, REPLACE ROOF/SLOPED B-1036
- CONSTRUCT 2ND, CE SHOP FACILITY
- EMERGENCY OFF-BASE WATER SUPPLY MAIN AT THE MARINE
- FY92 MCON P-275 PIER D UPGRADE PART A AND FY92 MCON
- REPLACE/REPAIR WALKWAY LIGHTS IN HOUSING AREAS 7,
- INSTALL INTERCOM SYSTEM AT BARKLEY ELEMENTARY SCHOOL
- REPAIR DEFICIENCIES
- REPLACE PREHEAT TUBES, B/3001
- ALBUQUERQUE, NEW MEXICO GENERAL MAIL/VEHICLE
- MCALLEN, TEXAS GENERAL MAIL FACILITY - ROOF
- RELOCATE LIGHTS AND POLES AT GATE 1
- REMOVAL OF ASBESTOS AND INSTALLATION OF NEW
- REPLACE SWITCHGEAR SWB-1, SWB-2 AND RELATED EQUIPMENT
- BUILDING #7 SPRINKLER/ASBESTOS ABATEMENT
- REPLACE LEAD CONDUCTORS
- REPLACE CONCRETE DRIVES
- SLEEPING AREA, FIRE TRUCK BAY
- UPGRADE LIGHTING
- RPR REFRACTORY BOILERS B/208
- CONST FACILITY AT COMPASS ROSE
- MECHANICAL RENOVATION BUILDING 231, NAS, DALLAS, TX
- REPAIR SANITARY SEWERS-BASE
- REPAIR HVAC
- REPAIR HVAC, ABATE ASBESTOS
- REPLACE CORRODED WATER PIPING, UPH BLDG., US COAST
- ELECTRICAL DEFICIENCIES PHASE II
- REPAIR FENDERING SYSTEMS PIERS 2, 5 AND 6 NAVAL
- CONSTRUCTION OF NEW MAIN ENTRANCE TO TO IRWIN ARMY
- ALTERATIONS AND RESURFACING VARIOUS ROADS AND PARKING
- PRESYNOPSIS-ALTERATIONS AND REPAIRS TO VARIOUS BLDGS
- MULTIPURPOSE BUILDINGS, DOUTHIT GUNNERY RANGE
- RESEAL CLARIFIERS, WWTP, CUSTER HILL, FORT RILEY,
- CONSTRUCT ELEVATOR, BUILDING 5
- REPAIR 15 KV CIRCUITS BASEWIDE
- RPR PAD MOUNTED ELECTRIC SWITCHGEAR
- REPLACE 3 CHILLERS, PLANT NO. 1, UNITED STATES NAVAL
- REPAIR HVAC, BUILDING 7404 AND 7424, FT. RILEY, KS
- IMPROVE DRAINAGE, BUILDINGS 1603 AND 1604, FORT SILL,
- REPAIR BOILER # 5, B/3001
- COVER WOOD TRIM IN LEE VILLAGE HOUSING AREAS 16, 17,
- REPAIR & PAINT SOUTH HELIX HOUSE AT THE NCTS, CUTLER,
- LIGHTING RETROFIT
- REPLACE STAIRS
- REPLACE PENTHOUSE ROOFS
- LOBBY RENOVATION AND UPGRADE - MAIN POST OFFICE - MT.
- REQUIREMENTS CONTRACT FOR REPAIR AND REPLACEMENT
- SAN MATEO, CALIFORNIA, INFORMATION SERVICE CENTER,
- RENOVATE 3RD FLOOR, BUILDING 8640, EGLIN AFB, FL
- ADDITION TO BUILDING 562, EGLIN AFB, FL
- 14B WOMENS PTSD
- RENOVATE AND EXPAND PARKING CONDITIONS
- REPAIR CAPEHART HOUSING PHASE III
- PAVE PARKING AREAS
- DENTAL CLINIC RENOVATION/BLDG 2
- ALTER/REPAIR GOLF CLUBHOUSE
- INDEFINITE QUANTITY AIRFIELD PAVEMENT REPAIRS AT NAVAL
- BUILDING 1 KITCHEN ROOF
- INTERIOR RENOVATION TO BUILDING NO. 7 GREENHOUSES, G1,
- REPLACE HVAC AND FUME HOODS IN 1969 WING
- REPLACE HVAC AND FUME HOODS IN 1969 WING
- REPLACE/REPAIR
- REPLACE BOILERS & REINSULATE STEAM
- ELEASE DETECTION AND CORROSION PROTECTION, NAVAL
- SAD LABORATORY RENOVATION - MARIETTA, GEORGIA
- REPLACE REFRIGERANT IN CHILLERS, POSTWIDE - FORT
- REPLACE REFRIGERANT IN CHILLERS, POSTWIDE - FORT
- ELECTRICAL RENOVATIONS - WATER TREATMENT PLANT, FT.
- CORRECT FIRE & SAFETY DEFICIENCIES BLDGS 400, 401 &
- CONSTRUCT OR IMPROVE HAZARDOUS WASTE ACCUMULATION
- CONSTRUCT OR IMPROVE HAZARDOUS WASTE ACCUMULATION
- CONSTRUCT PATIO COVERS, BLDGS 690, 791, AND 1954
- N DICKEY LAKE CAMPGROUND IMPROVEMENTS
- ASSATEAGUE BOATHOUSE PIER COMPLEX STABILIZATION PHASES
- REPAIR ROOFS VARIOUS LOCATIONS NAVAL SUBMARINE BASE
- FLOOR COVERING REQUIREMENTS
- WINDOWS, DOORS, ASSOCIATED HARDWARE
- REPLACE FACADES
- CONCRETE PAVEMENTS, MARINE CORPS AIR STATION, CHERRY
- EXHAUST FUME DEFICIENCY, BLDG 1956
- RENOVATE BUILDING NO. 11
- ADD/ALTER CONFERENCE CENTER
- O'HARA CAMPGROUND REHABILITATION
- INTERIOR REHABILITATION AND REPLACEMENT OF HVAC
- FDR ROCK BUTTRESSES
- PAINTING, STATION, MARINE CORPS AIR STATION, CHERRY
- REQUIREMENTS CONTRACT FOR REPAIR AND REPLACEMENT
- REPAIRS AND ALTERATIONS TO NIX, PHASEIII
- ROAD RE-CONSTRUCTION
- HVAC AIR DISTRIBUTION
- RELOCATE GASLINE AND REPR STRUCTR
- MODIFY EDUCATION OFFICE CLASSROOMS
- INDEFINITE QUANTITY CONSTRUCTION CONTRACT, BOILER
- PORTER WATERS RAMP PROJECT, MCCREARY CO., KENTUCKY
- INSTALLATION OF TWO NEW BOILERS AND ASSOCIATED
- INSTALLATION OF TWO NEW BOILERS AND ASSOCIATED
- INSTALLATION OF TWO NEW BOILERS AND ASSOCIATED
- INSTALLATION OF TWO NEW BOILERS AND ASSOCIATED
- PROVIDE & INSTALL CENTRAL AIR CONDITIONING SYSTEM
- REPAIR LEAKING SHOWERS
Today's CBD Index Page
Created on September 29, 1996 by Loren Data Corp. --
info@ld.com
|
|
|